Chidliak's summer field program has now been announced.
Press release -- July 21st, 2015
As expected, most of the focus (all) is converting as much tonnage into the Inferred category for CH-6 and get the biggest maiden inferred resource for CH-7.
The biggest part of the work includes:
2 x 260 metres core drill holes into the southern part of CH-6
and
3 x 220 metres core drill holes into CH-7. It looks like these 3 holes will be focused mostly on the Domain 2 area. (largest tonnage).
Other work includes revisiting existing core form CH-6 and CH-7 and submit more tests/samples to help further refine the geology.
700 kg's of existing material from CH-6 and 1200 kg's of existing material from CH-7 will be sent away for caustic fusion.
It is possible that these two will be the next results to come to the press.
No comments:
Post a Comment